Case Study

Integrated Control Safety System (ICCS) Yokogawa’s CENTUM VP U tilized at World’s Only Fully Operational Ocean Thermal Power Generation Facility

Integrated Control Safety System (ICCS) Yokogawa’s CENTUM VP U tilized at World’s Only Fully Operational Ocean Thermal Power Generation Facility

Pages 4 Pages

http://www.yokogawa.com/success/ Integrated Control Safety System (ICCS) Yokogawa’s CENTUM VP Utilized at World’s Only Fully Operational Ocean Thermal Power Generation Facility Location: Kume Island, Okinawa, Japan Order date: July 2012 Completion: April 2013 Industry: Renewable Energy Okinawa Prefecture’s efforts to achieve a low carbon society Okinawa Prefecture is promoting clean energy with the aim of becoming a low-carbon society

Join for free to read