Case Study

Top Silo Installation Project

Top Silo Installation Project

www.beck-pollitzer.com Top Silo Working at Height! Call us now on 0844 8475413 Top Silo Installation Project Beck and Pollitzer Oldham Depot were awarded the following Installation project which was carried out at Nelstrop Mill, Stockport Nelstrop supplied all plant and cranage and outside generator as and when needed. Duration of the job was six weeks working six days a week 10hrs per day. The installation consisted of steel wo

Join for free to read