Case Study

Thomas Nelson High School - Louisville, Kentucky •Annual energy cost for this building is $103,164/year which translates into $0.71/sf/yr

Thomas Nelson High School - Louisville, Kentucky •Annual energy cost for this building is $103,164/year which translates into $0.71/sf/yr

NUDURA Project Profile 866-468-6299 www.nudura.com FAST FACTS Thomas Nelson High School - Louisville, Kentucky • A Geothermal HVAC system was installed and has primed this building to be “Net Zero Ready” • TNHS is the first high school in Kentucky to be recognized by the EPA as qualified for their “Designed to Earn the Energy Star” program • Annual energy cost for this building is $103,164/year which translates into $0.71/sf/yr • Due to the holistic approach to energy efficiency take by the design team, it was honored by the EPA Energy Star Program with the recognition that it was “Designed to Earn the Energy Star” PROJECT STATISTICS Location: Louisville, Kentucky Type: Commercial Safe Room Size: 6,150 gross sq ft. ICF Use: 7,200 sq ft Cost: $23,557,000 Total Construction: 375

Join for free to read