Case Study
The Starting-Point Blackfriars: Taking It To The Bridge
Location London’s Blackfriars station, Network Rail Size 1.1 MWp Annual generation 9000,000 kWh CO 2 savings per year 513,000 kg Estimations only, correct at time of installation Case study The starting-point In a massive upgrade of London’s Blackfriars station, Network Rail was expanding into Blackfriars Bridge, built across the Thames in 1886. They planned to add a roof and wanted to make it more sustainable. Blackfriars: taking it to the b