Case Study

The Shard at London Bridge

The Shard at London Bridge

Pages 1 Pages

www.severeld.com The Shard at London Bridge Location: London Client: Teighmore Construction Main Contractor: Mace Group Engineer: WSP Cantor Seinuk Architect: Adamson Associates Tonnage: 12,700 Completion Date: 01/12/2011 Project Overview: The Shard at London Bridge, is the tallest building in Western Europe standing at 310m and provides approximately 55,800 sqm of hotel, luxury residential accommodation and oce space. Severeld was responsible

Join for free to read