Case Study

The Right Methods Led to Big Time Savings for Proposal Drawings at Dellner

The Right Methods Led to Big Time Savings for Proposal Drawings at Dellner

Pages 2 Pages

The right methods led to big time savings for proposal drawings at Dellner “We save about 200-300 hours per year with all the changes we have made to the proposal library, with the sales configurator as the engine. The collaboration between us and Symetri has been good. They have helped us produce tools and given us excellent support,” Anna Enochsson, Sales Engineer Manager at Dellner. Business Challenge • Had a requirement to be able to

Join for free to read