Case Study

The Meadows Shopping Centre

The Meadows Shopping Centre

Pages 4 Pages

CLIENT PROJECT LOCATION DURATION ARCHITECT Legal & General The Meadows Shopping Centre Refurbishment Chelmsford View case study online 18 weeks TP BennettClient Legal & General hired Hatmet to work with architects TB Bennetts and undertake a full refurbishment of the malls which make up the Meadows Shopping Centre. The project took 18 weeks in total to deliver and during this time the mall was able to stay open and carry on trading as normal. The client called for a transformation of the existing centre and this is exactly what Hatmet delivered. The design created by the architects called for a new steel structure to be installed at each of the three entrances to the centre and the removal of the slab which had previously been a part of the High Street entrance. Hatmet Limited

Join for free to read