Case Study

The Kia Oval - Peter May Stand

The Kia Oval - Peter May Stand

Pages 1 Pages

CASE STUDY 01403 799600 info@cordek.com Please contact us for more information The Kia Oval - Peter May Stand Case Study 10/16 Project Scope In order to meet the challenging redevelopment programme, it was proposed that expanded polystyrene (EPS) structural fill be used. Abstruct Consulting specified Filcor EPS which would be laid over the existing terraces in order to form and support the new terraces. Cordek provided the contractors, Bennett Construction, with guidance on the buildability and suitability of Filcor 45 Expanded Polystyrene (EPS) for use as a quick and economical structural fill solution. The Solution The versatility of Filcor EPS means that virtually any shape, size or profile can be created with relatively short lead times. Compared to traditional fill met

Join for free to read