function select set Eltek Squirrel 1000 series RX250IV Dipole PC running Darca Compost Probe #1 (up to max of 8) Bay 1 Office TR-38 #1 (up to max. of 30) function select set Eltek Squirrel 1000 series #2 The Eltek in-vessel compost system is designed for batch tunnel-in-vessel composting systems and is equally suitable for Windrow composting. The system is approved for use in both PAS100 and Non PAS100 facilities. Typically the vessel is 3m x 3m x 10m long with a retractable roof. Such a vessel can take 100 to 200 tons of feed stock. The batch tunnel-in-vessel composting process can comprise of a two stage pasteurisation process of at least 60°C for a minimum of 48 hours as required under ABPR 2005 / National Standards, or 70°C for 1 hour under the European Standard. Our system wor