Case Study

The Edrington Group

The Edrington Group

CASE STUDY Ref: 6065D EDRINGTON DISTILLERY BOTLING HALL ASBESTOS 2013-14 £1.3M CLIENT—THE EDRINGTON GROUP 29 WEEKS Thompsons were appointed by the Edrington Group as Principal Contractor to undertake the removal of the internal textured coating containing Chrysotile asbestos to the barrel vaulted roof off the bottling hall where “The Macallan” whiskey is produced in Glasgow. The total area of the roof was some 1600m2 containing 6n