Case Study
SABIC UK
CASE STUDY Ref: 6545 NAME Teesside Cracking Project—Boiler Removal YEAR 2016 VALUE £250k CLIENT Jacobs for SABIC UK DURATION 6 Months As part of the conversion of the existing plant to enable production of chemicals from a different feedstock, Thompsons were appointed by SABIC UK’s Principal Contractor, Jacobs, to carry out specialist asbestos re- moval works and careful removal of the boiler within the existing plant apparatus. The pla