Case Study

THE EARTH. UNDER CONTROL.

THE EARTH. UNDER CONTROL.

Pages 2 Pages

THE EARTH. UNDER CONTROL. Minova Bohemia s.r.o. Lihovarská 1199/10 716 00 Ostrava-Radvanice, CZ T: +420 596 232 801 F: +420 596 232 994 E: minova.cz@minovaglobal.com www.minova.cz CASE STUDY GEOFLEX BB SILICATE 2-C RESIN FOR CONSOLIDATION OR STRENGTHENING OF LOOSE SURFACE / BALLAST BONDING Problem definition IV. railway corridor is one of the main railway lines intersecting Czech Republic from north to south and as in the case of I., II. and III. railway corridor is currently under its gradual moderniza- tion. The main objectives of modernization of transit corridors in the Czech Republic is to in- crease the speed to 160 km/h and an increase of the traffic capacity or railroads (eg. double- track lines). In the framework of corridor section Sudomeri