Case Study

The Complete Package: Controls Replacement And Equipment / Process Optimization With No Down Time

The Complete Package: Controls Replacement And Equipment / Process Optimization With No Down Time

Pages 2 Pages

INDUSTRIAL Rexam Plastics had a dated Building Automation and Controls System (BAS) controlling their cooling tower and chilled water along with the environment and humidity controls inside their plant. The obsolete controls system led to issues with regulating the humidity in the plant and the temperature controls for their machines and process equipment. If the humidity in the facility was too high, it affected the quality of the produc

Join for free to read