Case Study

The Beaten Path Isn’t Always The Fastest

The Beaten Path Isn’t Always The Fastest

Pages 2 Pages

THE BEATEN PATH ISN’T ALWAYS THE FASTEST. CHEVRON DRILLING MODULE TEXAS, USA29 APRIL 2014 APRIL 2014 REBUILDING THE DM INTO ONE PIECE ON ITS WAY TO INGLESIDE Discover more on www.mammoet.com WINNING 60 DAYS WITH PARALLEL CONSTRUCTION AND WELL-PREPARED TRANSPORT. 21 APRIL 2014 PREPARING BARGE RAMP FOR LOAD-OUT 21 APRIL 2014 CUSTOM MADE RAMP FOR LOAD-OUT A Z When Nabors was building a drilling module (DM) for its client Chevron, Mamm

Join for free to read