Case Study

Terrengganu #1 CALM

Terrengganu #1 CALM

Pages 2 Pages

Scope of Work SOFEC designed and constructed a multi-product CALM terminal and two PLEMs and also designed the four 18-in. pipelines, which link the terminal to a refinery two miles away. SOFEC determined wind, wave and current forces using analytical techniques and wave tank testing and performed all foundation design for the six-leg CALM and the PLEMs. SOFEC designed and fabricated all structural and mechanical components, which include a

Join for free to read