Case Study

Cfe#1 CALM

Cfe#1 CALM

Pages 1 Pages

Scope of Work The SOFEC CALM system was designed and fabricated to import heavy fuel oil feedstock for a power plant. The fluid transfer system was designed to allow circulation of hot diesel after every unloading. General Description Client Name: Comision Federal de Electricidad (CFE) Contract Award: January 1988 Installation Date: September 1988 Application: Heavy Fuel Oil Import Project Specifications Water Depth: 16m (51ft) Tank

Join for free to read