Case Study

Takata Holdings

Takata Holdings

Critical Issue Takata’s manufacturing facilities depend on information technology. If the company’s business systems ever became unavailable, the plants wouldn’t be able to ship or receive goods and it wouldn’t be long before system unavailability would curtail production. Given the size of Takata’s operations, the cost of a long period of downtime would be exceptionally high. Results • Protects operations from downtime • Handles large transaction volumes with negligible impact on system performance • Allows non-intrusive role swap testing • Very easy to use and manage Technologies Software: • Assure iTERA HA • Mix of highly customized application packages and custom-built software • IBM i Hardware: • 2 x IBM Power 570 (production & backup) Business Challenge Takata is a maj

Join for free to read