Case Study
SXD Pump with Dual Stage Gas Handling Software Improved Run Time by 105% in Montana
Case History An operator in Montana used a competitor’s compression-style pumps in wells with high levels of gas production. The horizontally completed wells had short run times and frequent workovers. With the competitor’s equipment, the operator’s wells had a total of 13 workovers and intervention costs totaled more than USD 2.6 million. Average mean time to failure (MTTF) for 16 wells in the ? eld was 430 days. The operator approache