Case Study
Surpassed Predicted Lock Up Depth
DON’T LET JUST ANYONE TAKE ON YOUR DOWNHOLE CHALLENGES. DEMAND THE BEST. DEMAND TTS. WWW.THRUTUBING.COM Case Study XRV TM Surpassed Predicted Lock-Up Depth to Reach TD Case Study No. 4203 RESULTS: Lock-up simulations predicted a max achievable depth of 11,867’ (3617m) in a 13,342’ (4067m) well and the customer was looking for a way to reach TD without having to incorporate beads and FR fluid. Using Thru Tubing Solutions’ Milling Assembly in