Case Study

Reached Record Depth

Reached Record Depth

DON’T LET JUST ANYONE TAKE ON YOUR DOWNHOLE CHALLENGES. DEMAND THE BEST. DEMAND TTS. WWW.THRUTUBING.COM Case Study XRV TM Reached Record Depth of 20,783’ in the Bakken Case Study No. 4202 RESULTS: Utilizing, Thru Tubing Solutions’ Milling Assembly in conjunction with the XRV TM , TTS was able to efficiently complete a mill out operation inside a 4 ½” 11.6# casing. This specific wellbore had a liner depth of 10,764’ (3281m) and had a kickoff

Join for free to read