Case Study
Surface SRU Telfer, Western Australia
AMC MINERALS // SURFACE SRU $20,700* SAVINGS PER RIG PER MONTH 50% REDUCTION IN MUD VOLUME 10% INCREASE IN KPIS 80% REDUCTION IN WATER USAGE SUMP NO LONGER REQUIRED AMC’s challenge was to reduce the customer’s operational costs and environmental impact on site in the Sandy Desert, East Pilbara Western Australia. The SRU proved to be a financial benefit, not a cost, demonstrating savings in mud consumption, water usage and KPIs and b