Case Study

Surface SRU Aspromin Drilling Site, Taltal - Chile

Surface SRU Aspromin Drilling Site, Taltal - Chile

AMC MINERALS // SURFACE SRU US $36,120* MINIMUM SAVING (20 DAY TRIAL PERIOD) 70% REDUCTION IN MUD USAGE 60% REDUCTION IN WATER USAGE (147,500L IN 20 DA YS) ENHANCED OPERATIONAL EFFICIENCY AND PRODUCTIVITY 65% REDUCTION IN CARTAGE COSTS An exploration drilling project, located in a mountainous site east of T altal, Chile was hindered with limited water supply and high logistical costs. Water had to be carted by trucks 240km to the

Join for free to read