Lamb Blvd. Improvement Project North Las Vegas, Nevada The Lamb Blvd Improvement Project involved constructing a new bridge for Lamb Blvd. over the UPRR tracks in North Las Vegas. Supporting the bridge are 49 drilled shafts ranging in diameter from 24” to 72” and lengths from 20’ to 100’. 72” diameter Pier shafts required the installation of permanent CMP Liners to accommodate cutting concrete off 8’ below top of shaft design elevation.