Case Study

BNSF - Plattsmouth Bridge

BNSF - Plattsmouth Bridge

Pages 1 Pages

BNSF - Plattsmouth Bridge Plattsmouth, Nebraska Completed in 2012, this project included the installation of (22) 4’-6” to 8’-6” diameter permanently cased rock socketed caissons supporting the BNSF Railroads new bridge over the Missouri River between Plattsmouth, NE and Pacific Junction, IA. Caisson installation depths ranged from 85ft to 145ft including 10ft to 35ft shall sockets. Work on land was completed with an IMT 220 drill r

Join for free to read