Case Study

Supplying a 500kW Herz® BioMatic part of a £10.7M construction project delivered for a new academy

Supplying a 500kW Herz® BioMatic part of a £10.7M construction project delivered for a new academy

Pages 1 Pages

Campsmount Academy DONCASTER Campsmount Academy in Doncaster is a newly constructed school replacing the original school building which suffered from bad fire damage. This essential project was funded with Department for Education contributions after the closing of the Building Schools for the Future scheme just before the fire damage occurred. The £1 0.7M Wates Group project began in 20 1 1 and opened in 20 1 2. The rebuild has included t

Join for free to read