Case Study
Supplying 500kW Herz® BioMatic installed for a new build school
Stanley Park High School SURREY Stanley Park High School in Surrey is an ever growing and very popular school. Having quickly grown from 800 to over 1000 students in the space of four years, it became clear that the school campus needed to grow with it. The school desired to remain small in feel but large in size, and has therefore split its campus into four schools centralised by a large atrium building. The heart of the school is now home