Case Study

Superior Odor Control at Wastewater Pretreatment Plant for Food Processing Facility

Superior Odor Control at Wastewater Pretreatment Plant for Food Processing Facility

Pages 1 Pages

Results are examples only. They are not guaranteed. Actual results may vary. Background The wastewater pretreatment plant was constructed in 2007 to handle process waste from a large food processing complex. The plant, which processes 600,000–800,000 gallons of water per day, receives process wastewater from three different food processing plants. Since the plant is located near local businesses and a residential area, the odors from th

Join for free to read