Case Study
Superfund Landfill Builds Leachate Treatment System to Remove Lead and Other Heavy Metals per US EPA Consent Order
Superfund Landfill Builds Leachate Treatment System to Remove Lead and Other Heavy Metals per US EPA Consent Order
Remove lead and other heavy metals from Superfund landfill site groundwater/leachate to meet stringent discharge contamination levels per US EPA consent order - the client utilized SAMCO’s technology to precipitate out heavy metals, implement proper sludge handling and dewatering, and treat contaminated groundwater with superior filtration and ion exchange. To save the client 30% in project costs and deliver a solution in half the time, SAMCO proposed and implemented a temporary skid-mounted system to manage peak flows during the remedial construction phase, followed by a permanent enclosed trailer-mounted system for ongoing operations.