Case Study
Successfully Drilled First Deepwater Well in Malaysia
Case History The target well was the first of a series of deepwater exploration wells that an operator was planning to complete in Malaysia. The combination of hole verticality, rig heave from the floating rig, and water depth created a challenging environment. Baker Hughes worked closely with an operator to develop an effective drilling plan that covered all engineering aspects, including bottomhole assembly (BHA) configuration design,