Successful Revalidation Of Existing Pipeline
To de-oil, clean and revalidate a pipeline selected for replacement on the Eider platf orm. The campaign was perf ormed to enable the pipeline’s continued pr oduction before being replaced by a new water injection and oil pipeline. The pipeline was to be cleaned to the accepted North Sea standard of 30 parts per million (ppm) of hydrocarbons in water . Altus Intervention managed the de-oiling campaign in its entirety. Through the provision