Case Study
Subaru Technical Center
• Specified foamed glass aggregate as lightweight fill • Fill placement was under a light foundation for a new pedestrian bridge • Foundation soils consisted of soft, compressible material • UL-FGA used as load-compensating fill • Contractor self-performed installation of foamed glass aggregate The information contained herein is believed to be accurate and reliable. AeroAggregates, LLC accepts no responsibility for the results obtained through application of this product. AeroAggregates reserves the right to update information without notice. For most current information see our website aeroaggregates.com. 1500 Chester Pike | Eddystone, PA 19022 (833) 261-8499 | www.aeroaggregates.com © 2018 AeroAggregates PROJECT INFO Owner: Subaru Contractor: American Sitework LLC Volume: