Case Study

Structure monitoring: West London Line

Structure monitoring: West London Line

Pages 1 Pages

CASE STUDY Structure monitoring: West London Line CLIENT: NETWORK RAIL/BRIDGEWAY THE CHALLENGE Network Rail wanted to undertake a structural monitoring project on the West London Line. Concerned about the long-term movement and stability of 5 Overhead Line Equipment (OLE) columns installed on earth embankments which indicated significant movement was taking place. These masts were distributed over an extended section of track ranging between 50-500m apart with long term monitoring over several years expected. Network Rail wanted quick and early indication if movements were accelerating and to rapidly enable any possible remedial action which would be planned around engineering hours and operational schedules. OUR SOLUTION Senceive provided 5 high

Join for free to read