Case Study

Strip Breaks Reduced By 75 %,Availability Increased By 1 %

Strip Breaks Reduced By 75 %,Availability Increased By 1 %

Pages 2 Pages

Project Data The Production Line Double Reduction Mill, CPP Trostre Works Max. inspection width: 1,250 mm Max. inspection speed: 1,070 mpm Annual output: 1,300,000 t/a The Inspection System espresso by ISRA PARSYTEC InstantClassifier TM Automatic Classifier Build Environment Control Panel ODIS Value creation at Corus Packaging Plus (CPP) Trostre DR Mill by ISRA PARSYTEC Short payback period due to rapid production usage Decision making changed f

Join for free to read