Case Study
Stones River Water Treatment Plant
Smith Seckman Reid, Inc. (SSR)- Stones River Water Treatment Plant The $40 million Stones River Water Treatment Plant (SRWTP) upgrade and expansion project opened in February 2010. The state-of-art treatment plant is the largest membrane ?ltration system in Tennessee. The onsite sodium hypochlorite system-installed treatment plant is also the sole lime- softening water treatment plant in the state. The plant was originally built in 1966, then upgrade and expansion work began in 2004. During the project, eight of the nine existing buildings were upgraded and four new buildings expanded the facility to provide for integration of the best available technology. The 24-hour operating treatment plant is capable of generating 20 million gallons a day (mgd) of water. To bring the 40-year old deter