Case Study

River Water Intake, Pre-Filter to Water Treatment Plant

River Water Intake, Pre-Filter to Water Treatment Plant

Pages 2 Pages

Problem: Consulting engineers for the Buckman Diversion Project were challenged to find a filter system capable of handling sand concentrations up to 550 ppm from the Rio Grande River near Santa Fe, New Mexico—without having significant downtime or maintenance routines. Traditional filters were considered, but due to the expected high sand concentrations in the water and the related servicing requirements for these filters, they were rejec

Join for free to read