Case Study
STEWARDS ACADEMY, HARLOW
The project comprised of the design and construction of a Ball Hall single storey multi use sports hall and single storey ancillary areas including; fitness suite, changing rooms, assisted shower/wc room, disabled facilities, first aid room, reception area and plant room. The development consisted of a traditional pad and strip foundations, ground bearing reinforced concrete slab and structural steel frame. Traditional cavity walls were built up to a level of 2.7m with composite steel panel walls and roof over. Internal fair faced block walls to the sports hall, plastered walls to circulation areas and fully tiled walls to all changing and washroom areas. The internal fitting out included specialist timber sprung sports floor within the hall with various court markings and spr