Case Study
Spitfire Centre
Spitfire Centre This light industrial development comprises 11 units of various sizes, in three detached blocks with allocated delivery and parking areas. The Spitfire Centre has been a great success with small businesses. The project was introduced by Deeley Properties to Deeley Construction who were appointed as main contractor. The existing planning consent was reworked to accommodate 11 smaller commercial units as opposed to the previously approved four units, reflecting the need for affordable units for the local SME business community. The buildings were constructed from steel portal frames clad with insulated, profiled metal cladding walls, roof panels, roof lights and steel roller shutter doors. The build contract required Deeley Construction to carry out exten