Case Study
Spirax Sarco engineered system saves £150,000 per year for Corus
Spirax Sarco engineered system saves £150,000 per year for Corus A Spirax Sarco packaged plate heat exchange system is delivering energy savings worth £150,000 a year at Corus’s Llanwern strip steel processing plant near Newport, South Wales. The skid-mounted system was designed, supplied and commissioned by Spirax Sarco and uses waste heat from the steel works’ slab furnaces to preheat boiler feed water. The new system uses heat from ?as