Case Study

Spectris Advance Hydro Power – predictive maintenance management

Spectris Advance Hydro Power – predictive maintenance management

The savings from using advanced condition monitoring as an important part of the predictive maintenance strategy are enormous. Machine availability is increased, maintenance costs reduced, and overall production efficiency is improved Challenge To implement a conditioning strategy to improve the reliability of diagnoses and for making faster, more reliable maintenance decisions. Solution Strategies will be evaluated by the condition monitoring group to use existing systems so that data from the various systems can be correlated. Results Over a seven-year period, there have been numerous cases where catastrophic failures and consequential extended downtime has been avoided. Case study Case study: Brüel & Kjær Vibro | Predictive maintenance management at CEMIG 01 Spectris Advance

Join for free to read