Case Study
Specialized Crane Enhances Safety Through Advanced Engineering
challenge high-capacity crane needed to handle spent fuel When R.E. Ginna Nuclear Power Plant needed a specialized high capacity crane to be able to off-load spent fuel from their fuel pool to dry cask storage, they trusted the expertise of Konecranes. “We needed to find a partner that could provide us with a significant capacity crane and crane configuration dedicated design. One of the challenges was the fleet cask size – a 125 ton cask –