Case Study

Southampton Bridges

Southampton Bridges

Pages 1 Pages

Testconsult were contracted by Mabey Hire  Services  to  provide  bridge  monitoring  in- strumenta on package during the bearing  replacement  of  the  Redbridge  and  Millbrook ?yovers in Southampton, Hamp- shire.  Site work commenced May 2009 and  lasted for 9 months.     The two bridges where originally construct- ed in the 1950’s using cast in situ post ten- sion  concrete  and  carry  the  A35dual  car- riageway  arterial  route.   The  con

Join for free to read