Case Study
Southampton Bridges
Testconsult were contracted by Mabey Hire Services to provide bridge monitoring in- strumenta on package during the bearing replacement of the Redbridge and Millbrook ?yovers in Southampton, Hamp- shire. Site work commenced May 2009 and lasted for 9 months. The two bridges where originally construct- ed in the 1950’s using cast in situ post ten- sion concrete and carry the A35dual car- riageway arterial route. The con