Case Study

M56 Expressway & Thorley Lane Bridges

M56 Expressway & Thorley Lane Bridges

Pages 1 Pages

Testconsult  have  recently  completed  the  installa on  of  a  complex  instrumenta on  and monitoring system on one of the more  venerable bridges over the M56.  The instrumenta on and monitoring system  was installed on behalf of A1+, the local MAC  agent for motorway maintenance and con- sists  of  numerous  strain  and  temperature  sensors  designed  to  monitor  the  perfor- mance of the bridge under di?ering load and  seasonal temperatur

Join for free to read