Case Study

South Wastewater Treatment Plant, City of Hutto

South Wastewater Treatment Plant, City of Hutto

23 22 FNI was the design engineer for the treatment process, structural, architectural and mechanical components of the new 2-MGD Hutto South Wastewater Treatment Plant, which will be operated by Brazos River Authority (BRA). The new plant was designed for a peak capacity of 8 MGD with considerations for the future plant expansion to a 4-MGD average and 16-MGD peak capacity. As part of the preliminary design phase for the new wastewater treat

Join for free to read