Case Study
South Wastewater Treatment Plant, City of Hutto
23 22 FNI was the design engineer for the treatment process, structural, architectural and mechanical components of the new 2-MGD Hutto South Wastewater Treatment Plant, which will be operated by Brazos River Authority (BRA). The new plant was designed for a peak capacity of 8 MGD with considerations for the future plant expansion to a 4-MGD average and 16-MGD peak capacity. As part of the preliminary design phase for the new wastewater treat