Case Study
Central Wastewater Treatment Plant Influent Pump Station, Dallas Water Utilities
25 24 FNI developed an investigation/study, conducted preliminary design, final design and construction phase services for the new Influent Pump Station (IPS) to serve the Central Wastewater Treatment Plant and enhance peak wet weather flow management. The study phase included a detailed analysis of anticipated design flows, major equipment, site analysis, and hydraulic evaluation. Stage 1 design and construction involved t