Case Study

Solar PV

Solar PV

Pages 1 Pages

Solar PV Case Study Edward Woods Estate, Hammersmith & Fulham The Edward Wood Estate in Hammersmith & Fulham includes three 24 storey high rise tower blocks. These blocks originally constructed in 1967 have been extensively refurbished over the last 3 years including the installation of a full height PV facade on each block. British Gas Solar was contracted by Breyer Group to design, supply, install and commission the PV arrays, alongside th

Join for free to read