Case Study
Commercial Solar PV
COMMERCIAL SOLAR PV CASE STUDY 1325 N.E. Bond Street, Peoria IL 61603 |www.ruylecorp.com|Phone: (309) 674-6644|Fax: (309) 272-1330 QUICK GLIMPSE Customer Ruyle Mechanical Services, Inc. Measures Implemented Commercial Solar PV System Install Total Project Cost $62,500.00 30% Tax Credit $18,750.00 Solar Renewable Energy Credits (SREC) $32,523 over 5 years Modified Accelerated Cost Recovery System (MACRS) $15,397 over 5 years Expected Production ˜ 32,523 kWh/year or $2,000/year System Size 25 kW Estimated Payback 3.3 years OUR SOLUTION Solar PV systems are made up of photovoltaic cells, which are small semiconductors made from silicon and other conductors created in very thin layers. Chemical reactions with the sun release electrons, generating a di