The Project Client: Department of State Growth Value: $1.75M Completed: June 2015 10b Industrial Drive PO Box 812 Ulverstone TAS 7315 Phone: (03) 6425 6530 Fax: (03) 6425 6112 Email: info@vec.com.au www.vec.com.au ABN 42 067 541 879 Slip and Bank Stabilisation Rock Cuttings The works on the Slip and Bank Stabilisation Rock Cuttings project included the fo llowing key elements: • Pavement and pre-existing assessment condition survey; • Earthworks; • Surface drainage; • Supply and installation of rock fall fencing; • Supply and installation of rock mesh fencing; • Spot rock bolting; • Selective rock scaling; • Vegetation removal; • Traffic management; and • Sundry minor works. This project involved slip and batter stabilisation and associated works at 5 si tes: • Southern