Case Study

Colac Otway Shire Council Projects

Colac Otway Shire Council Projects

The Projects 10b Industrial Drive PO Box 812 Ulverstone TAS 7315 Phone: (03) 6425 6530 Fax: (03) 6425 6112 Email: info@vec.com.au www.vec.com.au ABN 42 067 541 879 Colac Otway Shire Council Projects Raffertys Road Bridge, Completed: January 2018 Value: $350k Design and construction of a 20.0m x 4.8m single span, single lane reinforced concrete bridge on Raffertys Road, over Gellibrand River. Lyness Road Bridge, Completed: July 2014 Value: $340k Design and Construct 20m long x 5.1m wide single span single lane bridge with 800mm deep precast pre-stressed concrete T-beams with 180mm thick in-situ poured concrete deck. Low performance W-beam bridge barrier with 4 No. 15.76m XT2000 approach terminations. 310UC158 steel piled foundation with concrete abutment and wingwalls

Join for free to read