Case Study
SIA Group - Laminaar Aviation Infotech Case Study
Time-delaying manual processes of generating Load-sheets and NOTOCs by Load Control Officers (LCOs) and obtaining their sign-offs on tarmac from Captain and Load Master pre-departure. Added burden of using critical air-side resources and infrastructure in a live operational area posing an air safety risk.