Case Study

Shore End Landing

Shore End Landing

Alcatel Lucent Submarine Networks contracted MUSC to complete post- lay burial of a shore end cable in Lurzon, Philippines, as part of the of the Asia America Gateway cable system. The burial was required to be 2.5m below sea-level – an unusual and dif? cult requirement to achieve. Solutions Step by step technical solution plan Project management Operational permitting including noti? cation to local authorities On-site security D

Join for free to read